Anzahl

The 3" Figure 1502 Tapped Male Blind Sub with Wing Nut and a 1/2" NPT port is a high-pressure closure assembly engineered to cap off and isolate female threaded hubs while providing a secure access point for instrumentation. Rated for a Cold Working Pressure (CWP) of 15,000 PSI, this specialized blind is an essential component for well testing, hydraulic fracturing, and flowback operations where real-time pressure monitoring or controlled depressurization is required.

Manufactured from premium high-strength forged alloy steel, this complete assembly includes the precision-machined male blind sub (featuring the elastomeric seal groove) and the heavy-duty Figure 1502 wing nut. The defining feature of this component is the 1/2" National Pipe Thread (NPT) tap located in the center of the blind sub. This allows operators to install pressure gauges, transducers, or needle valves directly onto the terminal point of the flowline. This setup enables rig crews to monitor trapped pressure or safely bleed off hazardous fluids and gases before breaking the hammer union connection.

Built to endure abrasive frac fluids, intense mechanical vibration, and extreme pressure cycling, the 3" 1502 Tapped Male Blind Sub ensures maximum safety and operational flexibility in the most demanding upstream environments.

Features & Benefits

  • Integrated 1/2" NPT Tap: Provides a secure, threaded port for pressure monitoring gauges, sampling equipment, or bleed-off valves.

  • Complete Assembly: Comes fully equipped with the male blind sub and heavy-duty wing nut for immediate field deployment.

  • 15,000 PSI CWP Rating: Specifically engineered to safely handle extreme pressures in critical well-control and stimulation environments.

  • Forged Alloy Steel Construction: Delivers exceptional structural strength, resisting fatigue, mechanical impact, and internal erosion.

  • Safe Depressurization: Enables operators to bleed off trapped line pressure before disassembly, preventing hazardous high-pressure blowouts.

  • Standard Interchangeability: Fully compatible with all industry-standard 3" Figure 1502 female threaded hubs.

Specifications & Technical Details

Category Specification
Component Type Tapped Blind Sub Assembly / Flowline Closure Fitting
Figure Number Figure 1502
Size 3"
Pressure Rating 15,000 PSI CWP (15M)
End Connection 3" Fig 1502 Male (with Wing Nut)
Tap Size 1/2" Female NPT
Material High-Strength Forged Alloy Steel
Service Type Standard Oilfield Service
Typical Applications Frac manifolds, well testing, gauge mounting, bleed-off lines
Testing & Compliance Strict dimensional verification and material traceability

Applications

This 3" tapped male blind sub with wing nut is essential for operations requiring secure high-pressure flowline termination with instrumentation access. Typical uses include dead-ending female branches on frac manifolds while monitoring line pressure, installing bleed-off valves on well-testing lines, and providing sampling ports on high-pressure pump discharge headers.

Quality Assurance

Each tapped male blind sub is manufactured under rigorous quality control protocols. The fitting undergoes precise dimensional inspection, thread gauging, and non-destructive examination (NDE) to guarantee absolute structural integrity and reliable blowout-proof performance under maximum 15,000 PSI operational loads.

Request a Quote

📞 +1 405 666 5011

📧 seo@blazess.com

Vollständige Details anzeigen

Product & Pricing Disclaimer

Product images displayed on this website are for reference and illustrative purposes only. Actual products may vary in appearance, color, dimensions, configuration, specifications, components, branding, packaging, or other characteristics. Customers are advised to contact our Sales Team to confirm the exact product specifications, configuration, compatibility, availability, and other requirements before placing an order.

All prices displayed on this website are indicative only and are subject to change without prior notice. Displayed pricing does not constitute a binding quotation, offer, or commitment to sell. Final pricing may vary depending on product specifications, configuration, quantity, availability, shipping, taxes, duties, market conditions, and other applicable commercial factors.

All quotations, orders, pricing, availability, specifications, commercial terms, and acceptance of any order are subject to final review, confirmation, and approval by the Company. The Company reserves the right, at its sole discretion, to correct errors or inaccuracies, revise or withdraw pricing, modify product information or specifications, reject or cancel orders where permitted by applicable law, and determine final commercial terms.

Customers should contact our Sales Team at +1 (405) 666-5011 or email us at seo@blazess.com for current product information, confirmed pricing, availability, and an official quotation before making purchasing decisions.