跳至产品信息
1 / 1

Blaze Sales & Service

Repair Kit for 2" Flapper Type Check Valve

Repair Kit for 2" Flapper Type Check Valve

常规价格 $660.00 USD
常规价格 $768.00 USD 促销价 $660.00 USD
促销 售罄
结账时计算的运费。
数量

The Repair Kit for the 2" Flapper Type Check Valve provides all the essential internal replacement components required to fully rebuild and restore your high-pressure flowline check valve to factory-new operational condition. Designed specifically for 2-inch flapper-style check valves (commonly integrated with FIG 1502 hammer union connections), this comprehensive kit ensures the safe, unidirectional flow of fluids and prevents hazardous high-pressure backflow during demanding well servicing operations.

Unlike dart-style valves, flapper check valves feature a full-bore opening when active, making them highly suitable for abrasive fluids containing high concentrations of solids, frac sand, proppants, and heavy cement slurries. However, extreme abrasion, shock loads, and high-velocity flow will eventually wear down the internal mechanism. This repair kit allows field technicians to quickly swap out the worn internal wear parts directly on location, dramatically reducing non-productive time (NPT) and saving the significant cost of replacing the entire heavy-duty valve body.

The kit typically includes a high-strength flapper, a precision-machined seat, a heavy-duty hinge pin, a torsion return spring, and all required elastomer seals (O-rings/packings) to re-establish a bubble-tight, leak-free seal under maximum working pressures up to 15,000 PSI.

Features & Benefits

  • Complete Rebuild Solution: Includes all necessary internal components (flapper, seat, pin, spring, and seals) to fully restore valve functionality and sealing integrity in one convenient package.

  • Optimized for Slurries: Flapper design maintains a full, unobstructed bore, reducing turbulence and wear when pumping highly abrasive frac sand and cement.

  • Field Replaceable: Designed for quick and easy inline maintenance, allowing operators to rebuild the valve on location without sending the unit off-site.

  • Cost-Effective Maintenance: Extends the operational lifespan of the expensive check valve body, providing significant cost savings over full valve replacement.

  • Premium Materials: The metallic components are machined from heat-treated, high-alloy steel for maximum erosion and corrosion resistance, paired with high-performance elastomers for reliable sealing.

Specifications & Technical Details

Category Specification
Component Type Internal Repair / Rebuild Kit
Compatible Valve Type Flapper Type Check Valve
Nominal Valve Size 2 Inch
Typical Pressure Rating Up to 15,000 PSI (15K CWP)
Typical Kit Contents Flapper, Seat, Hinge Pin, Torsion Spring, Elastomer Seals
Material High-Alloy Steel Internals / Premium Elastomers
Service Application Standard Service (Ideal for abrasive slurries, cement, frac sand)

Applications

This repair kit is essential for the routine maintenance and rapid field repair of 2" Flapper Type Check Valves used in high-pressure oilfield applications. Typical applications include high-rate fracturing manifolds, cementing lines, acidizing jobs, well testing, and flowback operations where a full-bore flow path and reliable reverse-flow prevention are mandatory.

Quality Assurance

All components within the 2" Flapper Check Valve Repair Kit are manufactured to strict OEM-equivalent tolerances and undergo rigorous quality inspections. The metallic parts are precisely machined and heat-treated for optimal hardness and wear resistance, ensuring your rebuilt check valve performs reliably under the harshest and most abrasive oilfield conditions.

Request a Quote

📞 +1 405 666 5011

📧 seo@blazess.com

查看完整详细信息

Product & Pricing Disclaimer

Product images displayed on this website are for reference and illustrative purposes only. Actual products may vary in appearance, color, dimensions, configuration, specifications, components, branding, packaging, or other characteristics. Customers are advised to contact our Sales Team to confirm the exact product specifications, configuration, compatibility, availability, and other requirements before placing an order.

All prices displayed on this website are indicative only and are subject to change without prior notice. Displayed pricing does not constitute a binding quotation, offer, or commitment to sell. Final pricing may vary depending on product specifications, configuration, quantity, availability, shipping, taxes, duties, market conditions, and other applicable commercial factors.

All quotations, orders, pricing, availability, specifications, commercial terms, and acceptance of any order are subject to final review, confirmation, and approval by the Company. The Company reserves the right, at its sole discretion, to correct errors or inaccuracies, revise or withdraw pricing, modify product information or specifications, reject or cancel orders where permitted by applicable law, and determine final commercial terms.

Customers should contact our Sales Team at +1 (405) 666-5011 or email us at seo@blazess.com for current product information, confirmed pricing, availability, and an official quotation before making purchasing decisions.