跳至产品信息
1 / 1

Blaze Sales & Service

Repair Kit for 3" Swing Type Check Valve

Repair Kit for 3" Swing Type Check Valve

常规价格 $780.00 USD
常规价格 $936.00 USD 促销价 $780.00 USD
促销 售罄
结账时计算的运费。
数量

The Repair Kit for the 3" Swing Type Check Valve provides all the essential internal replacement components required to fully rebuild and restore your high-capacity flowline check valve to factory-new operational condition. Designed specifically for large-bore 3-inch swing-style check valves (commonly integrated with FIG 1502 hammer union connections), this comprehensive kit is a critical maintenance asset for ensuring safe, unidirectional fluid flow and preventing dangerous high-pressure backflow during heavy-duty well servicing operations.

Swing type check valves feature a large clapper or disc that swings completely out of the flow path when active, making them exceptionally well-suited for high-volume, highly abrasive fluids containing frac sand, proppants, and heavy cement slurries. Due to the extreme abrasion, shock loads, and massive fluid velocities in 3-inch oilfield flowlines, the internal sealing mechanisms will eventually wear down. This repair kit allows field technicians to quickly swap out the worn internal components directly on location, dramatically reducing non-productive time (NPT) and eliminating the massive expense of replacing the entire heavy-duty valve body.

The kit typically includes a high-strength swing disc (clapper), a precision-machined seat, a heavy-duty hinge pin, and all required elastomer seals (O-rings/packings) to re-establish a bubble-tight, leak-free seal under maximum working pressures up to 15,000 PSI.

Features & Benefits

  • Complete Rebuild Solution: Includes all necessary internal components (swing disc, seat, hinge pin, and seals) to fully restore valve functionality and sealing integrity in one convenient package.

  • High-Volume, Full-Bore Flow: The swing mechanism allows the large 3-inch disc to move completely out of the fluid path, minimizing turbulence and pressure drop when pumping massive volumes of abrasive frac sand and cement slurries.

  • Field Replaceable: Designed for rapid, inline maintenance, allowing operators to rebuild the valve on location without sending the heavy unit off-site to a repair facility.

  • Cost-Effective Maintenance: Extends the operational lifespan of the expensive large-bore check valve body, providing significant cost savings over full valve replacement.

  • Premium Materials: The metallic components are machined from heat-treated, high-alloy steel for maximum erosion resistance, paired with high-performance elastomers for reliable, high-pressure 15K PSI sealing.

Specifications & Technical Details

Category Specification
Component Type Internal Repair / Rebuild Kit
Compatible Valve Type Swing Type Check Valve
Nominal Valve Size 3 Inch
Typical Pressure Rating Up to 15,000 PSI (15K CWP)
Typical Kit Contents Swing Disc (Clapper), Seat, Hinge Pin, Elastomer Seals
Material High-Alloy Steel Internals / Premium Elastomers
Service Application Standard Service (Ideal for high-volume abrasive slurries, cement, frac sand)

Applications

This repair kit is essential for the routine maintenance and rapid field repair of 3" Swing Type Check Valves used in high-capacity oilfield applications. Typical applications include high-rate fracturing manifolds, large-bore cementing lines, heavy frac-flowback operations, well testing, and choke manifolds where a full-bore flow path and reliable reverse-flow prevention are mandatory for equipment and personnel safety.

Quality Assurance

All components within the 3" Swing Check Valve Repair Kit are manufactured to strict OEM-equivalent tolerances and undergo rigorous quality inspections. The metallic parts are precisely machined and heat-treated for optimal hardness and wear resistance, ensuring your rebuilt check valve performs reliably under the harshest and most abrasive high-volume oilfield conditions.

Request a Quote

📞 +1 405 666 5011

📧 seo@blazess.com

查看完整详细信息

Product & Pricing Disclaimer

Product images displayed on this website are for reference and illustrative purposes only. Actual products may vary in appearance, color, dimensions, configuration, specifications, components, branding, packaging, or other characteristics. Customers are advised to contact our Sales Team to confirm the exact product specifications, configuration, compatibility, availability, and other requirements before placing an order.

All prices displayed on this website are indicative only and are subject to change without prior notice. Displayed pricing does not constitute a binding quotation, offer, or commitment to sell. Final pricing may vary depending on product specifications, configuration, quantity, availability, shipping, taxes, duties, market conditions, and other applicable commercial factors.

All quotations, orders, pricing, availability, specifications, commercial terms, and acceptance of any order are subject to final review, confirmation, and approval by the Company. The Company reserves the right, at its sole discretion, to correct errors or inaccuracies, revise or withdraw pricing, modify product information or specifications, reject or cancel orders where permitted by applicable law, and determine final commercial terms.

Customers should contact our Sales Team at +1 (405) 666-5011 or email us at seo@blazess.com for current product information, confirmed pricing, availability, and an official quotation before making purchasing decisions.